ISRI-2 public consultations

Public consultation on 5G, 4G and fiber optic infrastructure maps

2023-09-18

To properly implement the project "ISRI-2", digital maps of existing 5G and 4G infrastructure managed by private operators and the state and planned to be installed in the next 3 years, data on infrastructure coverage and possible theoretical network speeds are provided for public consultation, digital maps and "white area" information of existing and planned fiber optic infrastructure to be installed in the next 3 years.

To make sure that the digital maps prepared based on the collected data and the performed analysis and other provided information are accurate and correspond to the specific investment plans of private communication operators, we kindly ask interested parties to review the provided data and by 2023 October 18 and provide data clarification and/or information about existing or planned 5G, 4G and fiber-optic infrastructure in the next 3 years by e-mail to [email protected]. If necessary (for example, after receiving data from operators regarding planned new investments in fiber optic infrastructure, which are not reflected in the map and data), the maps and data will be revised.

Digital maps and other documents are available for public consultation:
1. Fiber optic infrastructure map (territory of the Republic of Lithuania)
1.1. Fiber optic infrastructure map (Alytus district)
1.2. Fiber optic infrastructure map (Kaunas district)
1.3. Fiber optic infrastructure map (Klaipėda district)
1.4. Fiber optic infrastructure map (Marijampole district)
1.5. Fiber optic infrastructure map (Panevėžys district)
1.6. Fiber optic infrastructure map (Šiauliai district)
1.7. Fiber optic infrastructure map (Taurage district)
1.8. Fiber optic infrastructure map (Telšiai district)
1.9. Fiber optic infrastructure map (Utena district)
1.10. Fiber optic infrastructure map (Vilnius district)
2. Map of 5G and 4G communication infrastructure and availability according to speeds (territory of the Republic of Lithuania)
2.1. Map of 5G and 4G communication infrastructure and availability 100 Mb/s (territory of the Republic of Lithuania)
2.2. Map of 5G and 4G communication infrastructure and availability 100 Mb/s (Alytus district)
2.3. Map of 5G and 4G communication infrastructure and availability 100 Mb/s (Kaunas district)
2.4. Map of 5G and 4G communication infrastructure and availability 100 Mb/s (Klaipėda district)
2.5. Map of 5G and 4G communication infrastructure and availability 100 Mb/s (Marijampolė district)
2.6. 5G and 4G communication infrastructure and availability map 100 Mb/s (Panevėžys district)
2.7. Map of 5G and 4G communication infrastructure and availability 100 Mb/s (Šiauliai district)
2.8. 5G and 4G communication infrastructure and availability map 100 Mb/s (Tauragė district)
2.9. Map of 5G and 4G communication infrastructure and availability 100 Mb/s (Telšiai district)
2.10. Map of 5G and 4G communication infrastructure and availability 100 Mb/s (Utena district)
2.11. Map of 5G and 4G communication infrastructure and availability 100 Mb/s (Vilnius district)
3. "White areas" map (territory of the Republic of Lithuania)
3.1. Maps of "white areas" (in the territories of individual municipalities)
3.2. Map of "white areas" grouped by municipalities (territory of the Republic of Lithuania)
3.3. "White areas" information
4. Methodology for the analysis of existing infrastructure and those planned to be installed in the next 3 years

Please note that on the basis of these maps, the most suitable technical solutions will be prepared, and network elements will be modeled, ensuring the connection of the objects planned to be connected during the implementation of the project to the high-speed communication infrastructure.

 

Public consultations on the technical solution of ultra-fast communication infrastructure

2023-10-11

To properly implement the project "ISRI-2", technical solutions and modeled network elements are provided for public consultations to ensure access to an extremely high-bandwidth broadband network for homes and businesses located in commercially unattractive areas. To make sure that the modeled technical solution for the development of high-speed communication infrastructure is accurate and meets the plans and needs of private communication operators, we kindly ask interested parties to review the submitted data and by 2023 November 11 send your approval or reasoned objections by email to [email protected].

Maps and other relevant information are available for public consultation:
1. Map of the planned infrastructure (territory of the Republic of Lithuania)
2. Map of planned infrastructure (Alytus district)
3. Map of the planned infrastructure (Kaunas district)
4. Planned infrastructure map (Klaipėda district)
5. Planned infrastructure map (Panevėžys district)
6. Planned infrastructure map (Šiauliai district)
7. Planned infrastructure map (Tauragė district)
8. Planned infrastructure map (Telšiai district)
9. Planned infrastructure map (Utena district)
10. Map of the planned infrastructure (Vilnius district)
 

Last updated: 26-10-2023