Public consultations on maps of fiber optic infrastructure required for 5G communication
2022-01-24
To properly implement the project "Ultra – fast network infrastructure", digital maps of the existing fiber-optic infrastructure managed by private operators and the state and maps of infrastructure planned to install in the next 3 years, as well as the infrastructure required for 5G communication, are provided for public consultation.
To make sure that the digital maps of the existing and planned fiber optic and 5G infrastructure required for the next 3 years and its coverage prepared on the basis of the collected data and the performed analysis are accurate and correspond to the specific investment plans of private communication operators, we kindly ask the interested parties to review the submitted data and by 2022 February 23 and provide data clarification and/or information about the available or planned infrastructure required for fiber optic and/or 5G communication in the next 3 years by e-mail [email protected]. If necessary (for example, after receiving data from operators regarding planned new investments in fiber optic infrastructure, which are not reflected in the map and data), the maps and data will be revised.
Fiber optic infrastructure map (territory of the Republic of Lithuania):
- Fiber optic infrastructure map (Alytus district)
- Fiber optic infrastructure map (Kaunas district)
- Fiber optic infrastructure map (Klaipėda district)
- Fiber optic infrastructure map (Marijampolė district)
- Fiber optic infrastructure map (Panevėžio district)
- Fiber optic infrastructure map (Šiaulių district)
- Fiber optic infrastructure map (Tauragės district)
- Fiber optic infrastructure map (Telšių district)
- Fiber optic infrastructure map (Utena district)
- Fiber optic infrastructure map (Vilnius district)
- Map of infrastructure and coverage required for 5G communication (Alytus district)
- Map of infrastructure and coverage required for 5G communication (Kaunas district)
- Map of infrastructure and coverage required for 5G communication (Klaipėda district)
- Map of infrastructure and coverage required for 5G communication (Marijampolė district)
- Map of infrastructure and coverage required for 5G communication (Panevėžio district)
- Map of infrastructure and coverage required for 5G communication (Šiaulių district)
- Map of infrastructure and coverage required for 5G communication (Tauragės district)
- Map of infrastructure and coverage required for 5G communication (Telšių district)
- Map of infrastructure and coverage required for 5G communication (Utena district)
- Map of infrastructure and coverage required for 5G communication (Vilnius district)
Map of 5G network "white areas" (territory of the Republic of Lithuania)
- Maps of the "white areas" of the 5G network (in the territories of individual municipalities)
- Map of 5G network "white areas" grouped by municipalities (territory of the Republic of Lithuania)
- 5G network “white areas” information
Please note that on the basis of these maps, the most appropriate technical solutions will be prepared, and network elements will be modeled, ensuring the connection of the planned 5,000 objects* to the high-speed communication infrastructure, this way, achieving the development goals of ultra-fast infrastructure, ensuring a speed of at least 1 Gb/s, in those areas of the country where analog communication services would not be provided on a commercial basis.
*Entities that promote social and economic progress - private and public companies, as well as non-governmental and governmental organizations and municipal institutions - are considered objects that should be connected to the high-speed communication infrastructure.
Public consultations on investment project
2022-05-03
To properly implement the project "Ultra – fast network infrastructure" (ISRI), a prepared investment project document is submitted for public consultations. The project aims to ensure the connection of 5,000 objects promoting social and economic progress to gigabit communication infrastructure. This way ensuring the development goals of ultra-fast infrastructure, which ensures a speed of at least 1 Gb/s, in those areas of the country where analog communication services would not be provided on a commercial basis. To ensure the relevance and accuracy of the investment project document, we kindly ask interested parties to review the submitted documents by 2022 June 2 and to provide information that should be included in the investment project or clarified by e-mail [email protected]
Information provided for public consultations:
- Investment project "High-speed communication infrastructure"
- 1 attachment. List of objects promoting social and economic progress located in areas where project intervention is possible
- 2 attachment. Maps of objects promoting social and economic progress located in areas where project intervention is possible (general territory of the Republic of Lithuania and individual municipalities)
- 3 attachment. Maps of infrastructure and availability required for 5G communication (general territory of the Republic of Lithuania and individual counties)
- 4 attachment. 5G network “white area” information
- 5 attachment. Maps of the "white areas" of the 5G network (general territory of the Republic of Lithuania and individual municipalities)
- 6 attachment. Fiber optic infrastructure maps (general territory of the Republic of Lithuania and individual counties)
- 7 attachment. Coverage maps of fiber-optic infrastructure and infrastructure required for 5G communication (general territory of the Republic of Lithuania and individual districts)
- 8 attachment. Maps of "white areas" of fiber-optic infrastructure and infrastructure required for 5G communication (general territory of the Republic of Lithuania and individual districts)
- 9 attachment. Maps of the optimal technical solution (general territory of the Republic of Lithuania and individual districts)
- 12 attachment. Project calculation
- 14 attachment. Results of a survey of cable operators
- 15 attachment. Wireless operator survey results
- 16 attachment. Public consultation information
Last updated: 26-10-2023